DAR Rail’s operational divisions are continuing preparations for the upcoming winter season. As part of this work, Askhat Tusupkanov, Director of Operations, visited the company’s Regional Division at Tobol station to inspect the condition of operational facilities and the locomotive fleet.

During the visit, production and storage facilities, locomotive stabling tracks, and the locomotive fleet itself were inspected. Particular attention is being paid to preparing locomotive cabs for winter operation. Specialists are checking the insulation of windows and doors, the operation of electric heaters and windscreen wipers, as well as windscreen ventilation and heating systems.

Personnel training is another important part of winter preparations. This year, 15 employees who previously worked as assistant locomotive drivers completed training at specialized training centers and began working as locomotive drivers. In addition, around 25 young assistant locomotive drivers have joined the company.

Special attention is being given to employees who will be working through their first winter in the profession. Driver instructors and supervisory and instructor staff are providing them with additional training and reviewing the specific requirements of working under winter conditions.
Winter preparations are underway beyond Tobol as well. This week, Azamat Kuanyshbayevich Sharseitov, General Director of DAR Rail, reviewed preparations at the Pavlodar Regional Division and the Ekibastuz site. Next week, Askhat Asylkhanovich Tusupkanov plans to inspect the readiness of the Astana Regional Division.
Preparatory work is continuing according to schedule. The main objective is to complete all necessary measures within the established timeframe and ensure safe and reliable operations throughout the winter period.
The team is working to ensure that the divisions and locomotive fleet are fully prepared for the winter season and that railway traffic safety is maintained at the required level,” Askhat Asylkhanovich Tusupkanov noted.